Multi Component Substations & Remote Instrument Buildings

Tarpon was contracted by a leading oil and gas producer to design, manufacturing and install three multi-component 25 kV medium voltage power substations, two remote…

Read More

Modular Laboratory Building

Tarpon was contracted to provide the complete installation package of the Laboratory Modular Building for the Kearl Oil Sands Project.

Read More

Burner & Controls Upgrade

Tarpon’s technical team managed to increase efficiency, reliability, safety compliance and cost savings
of the existing field equipment.

Read More

Burner & Combustion Safety Control System

Tarpon was contracted to supply a reliable burner system capable of supplying the maximum amount of heat into the heavy oil (1,000 barrel) production tank.

Read More

Water Treatment & Gas Distribution System

Tarpon was contracted to supply and install a new SCADA host system to replace the client’s existing third party internet-based system, which yielded reduced costs for the client.

Read More